New lease of life for Dickensian Building
90mm Insulation was primarily used but the contractor (RDL Plastering and Drylining Ltd) had to negotiate half a dozen other sizes of Insulation in order to level the 300+ year old building. Once levelled, a reinforcing, anti-crack glass fibre mesh was imbedded into dual coatings of Enewall polymer modified Multi-Purpose Adhesive (MPA), and finally upwards […]
Read more